Selected work

Engineering under real constraints.

Our work spans public-sector communications, upstream open-source engineering, multiplayer products, accessible meeting systems, and infrastructure programmes preparing for major capital decisions.

Case studies

Product delivery, technical integration, and project readiness.

Each engagement starts with a different constraint. The common thread is clear ownership of the technical path, evidence, and operating decisions required to move forward.

01 Delivered

Digital sovereignty

Extending Jitsi Meet for the Swiss Federal Supreme Court

A self-hosted conferencing integration that connected Jitsi Meet with conventional telephone participation while preserving institutional control of the service.

  • Jitsi Meet
  • Open source
  • Telephony
  • Public sector

2020

Delivered during the first lockdown

View case study
02 Merged upstream

Open-source product engineering

Lobby chat and challenge-response messaging for Jitsi Meet

Two upstream contributions gave moderators a direct communication path to participants waiting in a locked meeting lobby.

  • Jitsi Meet
  • WebRTC
  • Open source
  • Product engineering

2

Upstream pull requests

View case study
03 Completed engagement

Gaming and product development

From live chat to a complete cross-platform bridge experience

A first interface milestone grew into responsibility for product design, web and mobile development, real-time communication, operations, localisation, and digital growth.

  • Game UX
  • Web
  • Mobile
  • C++
  • Jitsi

4+ years

Milestone-based engagement

View case study
04 Current partnership

Accessible real-time communication

Developing AccessMeet for accessibility-first online meetings

A development and commercialisation partnership for a Jitsi-based meeting platform designed around different access needs, participant roles, and content formats.

  • Accessibility
  • Jitsi Meet
  • OCR
  • Captions
  • Product operations

Jitsi-based

Real-time meeting foundation

View case study
05 Pre-feasibility in progress

Infrastructure readiness

Preparing a 100 MW AI-ready data centre and renewable energy programme in Kazakhstan

Owner-side technical leadership for a phased data centre campus and associated renewable energy programme in Arshaly, Akmola Region.

  • AI infrastructure
  • Data centres
  • Renewable energy
  • Pre-feasibility

100 MW

Target IT capacity

View case study

How to read these stories

Scope and status stay explicit.

Delivered work is separated from active partnerships and projects that remain in development or pre-feasibility.

Targets and programme estimates are identified as such. They are not presented as completed construction, secured financing, or achieved performance.

Contact

Discuss a project or request a teaser.

Tell us whether you are exploring an AI software engagement, a real-time platform, an infrastructure-readiness track, or a renewable energy co-development opportunity. We will reply with the appropriate next step and level of information.